Two Options : A Block will be ''GREEN FRAME'' and B Block is fully renovated
25.11.2024
25.02.2025
No
No
22
Yes for A Block, No for B Block
No external changes of the Project are allowed. Copyright terms are included into the agreement by which customers take obligation not to ake any changes on external facad
Yes, throught the samples and 3D desighne visuals
Yes, project will be managed by the management company.
18 Months
33% is the minimum down payment
10% is the maximum discoount for the cash payment
Yes
Yes, company can buy a property with required documents: partner's decision and company founding documentation
Yes, in the POA must be written that the authorized person has right to purchase apartment
Yes, with the needed documents: Birth certificate and parent's signature
No, customer will not be able to sell appartment till the general registration.
Yes, customer can sighn Preagreement online.
No, everyone can buy apartment if they have foreign passaport
Preagreement will be registered in the justice house just in case of a full payment
12.5 % from the full amount of Unit price
Remaining sum will be returned to buyer after cancelation within 3 month
According the contract we have penalties for our company if we delay the completion of the project
landowner company: Ken Construction LLC (ID No 405038418)
Maqro Construction has agreement with the landowner and according the agreement Maqro Constraction is representative of the landowner by the attorneys which the landowner gives to Maqro
Maqro Construction represents the landowner if there is any disputes
Property will be transferred into ownership after exploitation of the project
A block units are apartments, b block units hotel type apartments
Yes, after the explotation of the project customer can apply
ABOUT CONSTRUCTION
Georgian security and fire systems regulations will be fulfilled.
Our project is not within the scope of fire regulation number 41.
The project is designed to withstand an 8-magnitude earthquake.
Electrical grounding projects were designed in accordance with the regulations. The application will be made accordingly.
Block A already exists. The block has been strengthened. B block is designed as raft foundation. Raft foundation: It is the foundation type that has better resistance to earthquake by allowing the loads from the building to spread superficially on the ground.
The concrete grade to be used in the project will be B30 quality in accordance with Georgian norms.
The rebar grade to be used in the project will be A500C quality in accordance with Georgian norms.
Gas block material will be supplied from the Turkish manufacturer Arkoz company.
A block exterior walls and flat partitions were designed 40 cm and interior partition walls 10 cm. B block exterior walls were designed as 20 internal partition walls and 10 cm.
jacketing will be done on B block for insulation. Facade coating will be applied in the A block, preserving the existing structure. B block will be covered with fire brick and decorative plaster paint application.
B block non-navigable roof system will be applied. Tile roof system will be applied in A block.
Heat insulation jacketing will be made.
Ceramic coating material will be used in A and Block entrance halls.
Wrought iron, glass and aluminum railings will be made on balconies and stair railings.
A generator was envisaged by taking into account the possible energy cuts for the elevators.
An extra water tank is provided.
One elevator for A block and two elevators for B block were designed.
We will not have a freight elevator.
Elevators will be Mitsubishi brand.
Block B was designed as 3.10 meters.The ceiling height for the A block is variable according to the appartments.
Green frame apartments include partition walls, gypsum plaster production, floor screed production, balcony ceramic production, apartment exterior door, window aluminum joinery and electrical and mechanical infrastructure works.
Interior built apartments include partition walls, gypsum plaster production, paint, floor screed production, ceramic and laminated coating production inside the apartment, doors inside the apartment, balcony ceramic production, apartment exterior door, window PVC joinery, kitchen furniture, radiator, cooker, hood, sanitary ware, wet areas suspended ceiling works.
It will be supplied from Turkish manufacturers Hes Kablo and Ãznur Kablo.
It will be supplied from Turkish manufacturers Hakan Plastik and Fırat Plastik.
Steel cladding with a wood look will be made.
Exterior doors will be supplied by Turkish manufacturer Koridor Ãelik Kapı and joinery will be Deceuninck brand.
It will be supplied from the Turkish manufacturer Vitra Seramik.
Turkish manufacturer Floorpan company's 10 mm thick material will be used.
It will be supplied from the Turkish manufacturer Vitra Seramik.
It will be supplied from the Turkish manufacturer Vitra Seramik.
Lacquer coating inner doors will be produced and installed by Bellissa Furniture
It will be supplied from Georgia company Belissa Furniture. Special production will be made.
Kitchen appliances will be supplied by the German manufacturer BOSH.
It will be supplied from the Turkish manufacturer Artema.
It will be supplied from the Turkish manufacturer Artema.
It will be supplied from the Turkish manufacturer Vitra.
It will be supplied from the Turkish manufacturer Vitra.
It will be supplied from the Turkish manufacturer Vitra.
It will be supplied from the Turkish manufacturer Artema.
The boiler is not within our scope.
It will be supplied from Turkish manufacturer ECA company.